What is a custom pool?
A custom pool is a pool drawn and engineered for one yard.
The City of Phoenix defines a custom pool the same way: “an engineered pool design for use at one site specific location.” The other kind is a standard plan, one engineered design that a builder has approved once and repeats from yard to yard.
Every pool Longshadow builds is custom. It starts as a drawing of your yard: the house, the walls, the afternoon sun and the gate the digger has to fit through.


A standard plan and a custom pool, side by side
A standard plan
A custom pool
The design
A standard plan: One engineered design, repeated from yard to yard.
A custom pool: Drawn for one yard, around its house, its walls and its sun.
The engineering
A standard plan: Done once, for the plan.
A custom pool: Site specific engineering and calculations.
The city’s review
A standard plan: About 5 days on average, for a plan Phoenix has already approved.
A custom pool: Longer. Phoenix adds a structural review and sets the fee by the pool’s value.
When you need it
A standard plan: A level yard and a shape from the builder’s book.
A custom pool: A hillside, a grotto or rock waterfall, or a slide, swim up bar or shade cover that loads the pool wall.
With Longshadow
A standard plan: We do not build standard plans.
A custom pool: About 7 weeks for the engineering and the permit, before the dig.
The city’s side of each row is from the City of Phoenix Planning and Development Department: its Residential Pool/Spa Permit FAQ and its pool submittal guideline. The 7 weeks is Longshadow’s own.
What goes into a custom pool?
A custom pool has six parts you choose: the shape and size, the baja shelf, the spa, the interior finish, the deck and the equipment.

Shape and size
The yard decides the shape, and the setbacks and the sun decide where it lies. Most pools we draw are between 13 by 26 and 18 by 40 feet.

Baja shelf
A baja shelf is a ledge under a few inches of water, for loungers and small children. We build ours 6 feet long and 9 inches deep.

Spa
A spa is raised above the pool and spills into it. A spa built with the pool shares the pool’s pump, filter and heater.

Interior finish
The interior finish is the surface under the water: plaster, quartz or pebble. It sets the colour of the water. A pool is resurfaced every 10 to 15 years (HomeGuide, 2025).

Deck
The deck is the paving around the pool: concrete, pavers or travertine. We lay at least 4 feet of it on every side.

Equipment
The equipment is the pump, the filter and the heater or chiller, on a pad behind a wall. Comfortable water is 78 to 86°F (River Pools), and a chiller holds it there in July.
How long does a custom pool take?
A custom pool takes about 20 weeks from the day you sign to the first swim: 9 weeks on paper, then 11 in the yard.
A builder who quotes 8 to 12 weeks is counting from the dig. Sign today and the dates below are yours.

On paper9 weeks

Dig, steel2 weeks

The shell cures4 weeks

Tile, deck, plaster5 weeks

You swimfrom week 20
- Today. You sign.
- January 18We dig.
- April 5Your first swim.
9 weeks on paperEngineering, the city permit and your HOA.
11 weeks in the yardThe “8 to 12 weeks” you are quoted elsewhere is this stretch alone.
A custom pool, week by week
Week 0November 16
You sign
WeThe drawing, the price band and your dates are done before you sign. Then we start the engineering.
YouSign, and pick the tile and the finish within three weeks.
Week 9January 18
Permit in hand
WeEngineering, the city permit and your HOA papers, filed by us. A note every week on where they stand.
YouOne signature for the HOA.
Week 11February 1
Dig and steel
WeThe hole, the steel and the plumbing. The city inspects before any gunite goes in.
YouKeep the side gate clear for two weeks.
Week 15March 1
The shell
WeGunite sprayed and left to cure for three to four weeks.
YouNothing. We water the shell.
Week 18March 22
Tile and deck
WeWaterline tile, coping, the deck and the equipment. The city inspects again before plaster.
YouWalk the deck with your site lead before we plaster.
Week 20April 5
First swim
WePlaster, fill, start up and an hour of pool school: every switch and every valve.
YouGet in.
Week 24May 3
Thirty days on
WeWe come back after a month, check the water, the finish and the equipment, and fix what you list.
YouTell us what is not right.






What adds weeks
Four things add weeks to a custom pool.
- Your HOAAn HOA often takes longer to review a plan than the city does.
- Hard groundCaliche or rock can turn a dig of two days into one of five.
- The monsoonStorms between June 15 and September 30 stop work in an open yard.
- The panelAn electrical panel that needs an upgrade holds up the equipment.
City figures: City of Phoenix Planning and Development Department. Monsoon dates: National Weather Service. The weeks are Longshadow’s example for a pool with an HOA.
The price
What does a custom pool cost in Phoenix?
Most custom pools we build in Phoenix cost $85,000 to $140,000, all in. A play pool starts near $62,000. Make the choices below for the band on yours.
Your first swim, if you sign today
April 12 to May 3
- From signing
- 21 to 24 weeks
- Price band
- $115,000 to $135,000
One thing can still move the price: a hard dig. We write $3,000 to $10,000 into the contract for it.We reply the same business day.
What does Phoenix require for a pool?
The City of Phoenix requires four things of a new pool: a setback, a barrier, a way to keep the house and the pool apart, and two inspections.

3 feet from the line
Phoenix zoning keeps a pool at least 3 feet from the exterior property lines. Where the water’s edge is less than 5 feet from a line, the city asks for a survey waiver.
A barrier 5 feet high
The fence or wall around a pool is 5 feet high, measured on the outside, with no opening a 4 inch ball can pass. Gates close and latch by themselves, swing away from the pool, and latch at 54 inches or higher.
House and pool, apart
Phoenix asks for a barrier between the house and every new pool, and accepts three kinds: a fence around the pool, the house wall with doors that close and latch by themselves, or a motorized safety cover. Alarms and temporary fences do not count.
Two inspections
The city inspects a pool twice: before the gunite goes in, and again before the plaster.
We draw all four into your plan and book both inspections.
From the City of Phoenix Planning and Development Department: Residential Pool/Spa Permit FAQ and Pool Barriers Requirements (revised January 2026). Checked on November 17, 2026. The photo shows one way to meet them.
How you pay
You never pay ahead of the work.
The Arizona Registrar of Contractors tells every homeowner the same thing: “Do not allow payments to get ahead of the work.” So we drew our calendar that way. At every week, what you have paid is less than what is built, and we carry the difference.
Built
Paid
Dig and steel
- Built
- 40%
- Paid
- 30%
- We do
- The hole, the steel and the plumbing. The city inspects before any gunite goes in.
- You do
- Keep the side gate clear for two weeks.
- You pay
- 20% after the city passes the inspection.
Who builds your pool?
A licensed Arizona pool contractor builds your pool, with one site lead on it from the first day to the last. We put three promises in writing.
One site lead, first day to last.
You have their mobile number, and they are in your yard every working day.

The date is in the contract.
94% of our pools since 2019 were finished on it.

Check us with the state.
We hold Arizona's general swimming pool contractor license. Look any builder up before you call. Check a pool builder’s license with the state

Pools we built
Four of 412. Each one by day, then after dark: keep scrolling and its lights come on.


01 / 04 Desert Ridge

The spa spills into the pool over a concrete edge. Desert Ridge, Phoenix. 16 by 38 feet, with a baja shelf, a raised spa and a ramada. See the Desert Ridge pool, week by week
19 weeks from signing$120,000 to $135,000


02 / 04 Arcadia

A baja shelf: a few inches of water to sit in. Arcadia, Phoenix. 15 by 32 feet, with a baja shelf, a travertine deck and a lawn. See a pool like this, week by week
18 weeks from signing$85,000 to $95,000


03 / 04 Troon

Fire bowls at the vanishing edge, over the valley. Troon, Scottsdale. 14 by 40 feet, with a negative edge, a spa and fire bowls. See a pool like this, week by week
26 weeks from signing$190,000 to $215,000


04 / 04 Ahwatukee

A bench built into a play pool, for a small yard. Ahwatukee, Phoenix. 13 by 26 feet: a play pool with a bench, in pavers. See a pool like this, week by week
16 weeks from signing$62,000 to $70,000
Questions
The short answer comes first. Open a row for the rest.
Do I need a permit for a pool in Phoenix?Yes. We file it.
Yes. A new pool in Phoenix needs a permit from the Planning and Development Department, with a plan review before it. We prepare the plot plan and the engineering, file them and pay the city’s fees out of the contract price.
Can a custom pool fit a small yard?From 13 by 26 feet
Yes. Our smallest pools are play pools of 13 by 26 feet. Phoenix asks for 3 feet between the pool and the property line, and we draw the pool around what is left.
Is a spa cheaper built with the pool?Yes
Yes. HomeGuide (2025) puts a spa built with the pool at $6,000 to $15,000 and one added later at $8,000 to $25,000. Built together, the spa shares the pool’s equipment and its dig.
How deep is a custom pool?3 feet 6 to 6 feet
Most pools we build run from 3 feet 6 inches at the shallow end to 6 feet at the deep end, with a baja shelf 9 inches deep. A play pool is shallow at both ends and deeper in the middle.
What does my HOA need?A site plan. We file it.
Usually a site plan, the materials and where the equipment will stand, and a few weeks. We prepare the papers and file them, and you sign. An HOA often takes longer than the city.
What if you hit rock?A written allowance
Hard ground is the one thing nobody can see before the dig. We write an allowance of $3,000 to $10,000 into the contract, and you see the ground with us before any of it is spent.
Can I finance a custom pool?Yes
Yes. Many pool loans pay the builder in stages as the work is finished, which is how we bill anyway. We do not lend, and we take nothing from a lender.

Price my pool
When do you want to swim?
- TodayWe reply the same business day.
- This weekWe visit your yard. The visit is free.
- Next weekYou get the drawing, a price band and your dates.